WAHYUDI, W. F.; GARNIWA M.K., I. Economic and Financial Analysis of Cofiring the Coal Fired Steam Power Plant Capacity 660 MW with Biomass. Andalas Journal of Electrical and Electronic Engineering Technology, [S. l.], v. 1, n. 1, p. 27–30, 2021. DOI: 10.25077/ajeeet.v1i1.11. Disponível em: http://ajeeet.ft.unand.ac.id/index.php/ajeeet/article/view/11. Acesso em: 16 may. 2024.